Re: גרעיני ממשיך בעולם

lu הודעה ללאנָקוּב moinsdewatt » 18/05/20, 01:40

Le réacteur n° 1 du site de Barakah aux Emirats Arabes Unis devrait commencer ses réactions nucléaires de façon imminente.

UAE nuclear power plant to achieve criticality “very soon”

12 מאי 2020

Emirates Nuclear Energy Corporation (Enec) said last week, following the successful loading of fuel assemblies into the reactor, Barakah 1 is in an advanced stage of start-up.

Tests are continuing at units 2, 3 and 4 following the completion of all construction work.

Speaking to Fred Kempe, CEO of the Atlantic Council think-tank, in an online discussion of the impacts of Covid-19 on global energy demand Enec CEO Mohamed Al Hammadi said:

"Unit 1 will reach criticality very soon, and the Covid-19 pandemic has not derailed our plans. We have 700 employees working on the project to meet the timeline."

"The Barakah plant, the Arab World’s first peaceful nuclear energy facility located in the Al Dhafra region of Abu Dhabi, will change the way the UAE powers its growth," noted Al Hammadi.

"Producing 5.6 gigawatts of electricity while preventing the release of more than 21 million tonnes of CO2 emissions annually, the Barakah Plant will power the UAE with clean, safe and reliable baseload electricity," he stated. "It is also providing countless high-value jobs through the establishment of a sustainable local nuclear energy industry and supply chain.

Al Hammadi described Covid-19 as "the deepest financial and global economic shock" to hit the world in the past 100 years and a "multifaceted" crisis.

He said ENEC instigated measures including stopping all non-essential work, demobilising non-critical resources, locking down the Barakah site and taking other measures to keep its workers safe early on in the pandemic. To date, there have been no positive cases of coronavirus at the construction site.

Four Korean-designed APR-1000 reactors are under construction at Barakah, in Abu Dhabi. Work began on unit 1 in 2012, with units 2-4 following over the next three years.

Barakah 1 was completed in 2018. The UAE's Federal Authority for Nuclear Regulation (FANR) issued a 60-year operating licence to Enec subsidiary Nawah in February 2020. Fuel loading was completed in early March.


https://www.neimagazine.com/news/newsua ... on-7919639
0 x

moinsdewatt
מומחה Econologue
מומחה Econologue
הודעות: 4439
כתובת: 28/09/09, 17:35
מיקום: Isere
x 454

Re: גרעיני ממשיך בעולם

lu הודעה ללאנָקוּב moinsdewatt » 23/05/20, 11:50

La centrale nucléaire flottante Akademic Lomonosov est désormais complétement opérationelle.

World’s only floating nuclear power plant enters full commercial exploitation

2020 מאי 22

It officially becomes the 11th NPP in Russia and the northernmost one in the world

One-of-a-kind floating nuclear power plant (FNPP) “Akademic Lomonosov” has been fully commissioned in Pevek, Chukotka region in the Russian Far East. Andrei Petrov, Director of Rosenergoatom (Electric Energy Division of Rosatom), the subsidiary responsible for the FNPP project implementation, signed the relevant decree, Rosenergoatom says in its press release.

תמונה

“Today we can consider the floating nuclear power plant construction project successfully completed. We finished our main task for this year - fully commissioned the FNPP in Pevek, Chukotka region. Today, it officially becomes the 11th nuclear power plant in Russia and the northernmost one in the world,” Andrei Petrov noted.

Earlier, the Far East directorate of Rostechnadzor, Russia’s technical, nuclear and environmental watchdog, carried out an inspection of the project. Based on its results, the FNPP received a “statement of conformity”. This document verifies that the FNPP is built in accordance with all project documentation requirements. Additionally, the project received approval from Rosprirodnadzor, the executive authority controlling and supervising activities in the field of environmental management. Receiving these documents means that the FNPP fully adheres to all norms and regulations, including sanitary, epidemiological, environmental, fire safety, construction requirements and federal standards.

The FNPP started providing electricity to the isolated grid of the Chaun-Bilibino energy center of Chukotka on December 19, 2019. The US POWER magazine named this event as one of the six key global nuclear energy industry events of 2019.

The FNPP has already generated over 47.3 million kWh of electricity since being connected to the grid. Currently, it covers 20% of the Chaun-Bilibino energy center demand. The FNPP will become the main energy source for Chukotka following the Bilibino NPP shutdown.

The world's only floating nuclear power plant includes coastal infrastructure and the Akademik Lomonosov floating power unit (FPU) equipped with two KLT-40S reactors with an electric power of 35 MW each. The FNPP power capacity is 70 MW while the heat capacity is 50 Gcal / h. The plant’s length is 140 meters, its width is 30 meters, its displacement is 21,500 tons. The service life is 40 years.



https://en.portnews.ru/news/296239/
0 x
moinsdewatt
מומחה Econologue
מומחה Econologue
הודעות: 4439
כתובת: 28/09/09, 17:35
מיקום: Isere
x 454

Re: גרעיני ממשיך בעולם

lu הודעה ללאנָקוּב moinsdewatt » 28/05/20, 00:23

EDF dépose une demande pour un projet de centrale nucléaire britannique

REUTERS•27/05/2020 par Susanna Twidale

EDF a déposé auprès des autorités britanniques une demande d'autorisation pour la construction de deux réacteurs nucléaires EPR à Sizewell C, un chantier estimé à 17 à 18 milliards de livres (19 à 20 milliards d'euros) dans l'est de l'Angleterre, a annoncé le groupe français mercredi.

Cette demande était attendue en mars mais a été retardée en raison de l'épidémie provoquée par le nouveau coronavirus.

Sizewell C est la deuxième centrale nucléaire qu'EDF espère construire en Grande-Bretagne après Hinkley Point, dont le chantier devrait être achevé en 2025.

Si elle voit le jour, elle permettra de fournir de l'électricité à environ six millions de foyers et créera 25.000 emplois, affirme EDF.

Certains habitants de la région se plaignent cependant que le dépôt de cette demande intervienne alors que des restrictions de déplacement sont toujours en vigueur face à l'épidémie de COVID-19, ce qui limitera la possibilité d'un débat public.

EDF a annoncé qu'il allait prendre des mesures pour faciliter l'étude de son dossier par la population, notamment en prolongeant la période de pré-examen.

EDF et le chinois CGN ont signé en 2016, en même temps que les contrats pour le projet d'Hinkley Point, des accords relatifs au projet Sizewell C concernant le développement, la construction et l'exploitation de deux réacteurs EPR pour une capacité totale de 3,2 gigawatts.

Pendant la phase de développement précédant la décision finale d'investissement, la part d'EDF dans ce projet est de 80% et celle de CGN de 20%, le groupe français soulignant dans son document de référence qu'il n'aura plus vocation à contrôler Sizewell C une fois la décision prise et que ce principe impliquera donc la participation d'autres actionnaires.

La décision finale d'investissement dans Sizewell C est envisagée pour fin 2021.

Hinkley Point C sera la première nouvelle centrale nucléaire construite en près de 20 ans en Grande-Bretagne lorsqu'elle sera achevée. Le projet a connu plusieurs retards et son coût est maintenant estimé à environ 21,5 à 22,5 milliards de livres.

EDF prédit que le chantier Sizewell C sera environ 20% moins cher.


https://www.boursorama.com/actualite-ec ... 1dd61ab2d7
0 x