The spent fuel pool in the upper part of each reactor building stores fuel rod assemblies that have been used to generate electric power. To reduce the risk from these spent fuel rods, the actual removal of the fuel from the accident-hit reactor buildings, or preparations therefor, are being carried out.

What Are Spent Fuel Rods?

Fuel rods that have been used to generate electric power in a nuclear reactor are replaced with new fuel after they are no longer usable. The replaced fuel rods are spent fuel. Since the spent fuel rods continue to generate heat, they are cooled for stable storage.

Status of Fuel Removal in Each Unit

Unit 1 Status

Survey of internal state

Removal of rubble
(operating floor)

Construction of a large cover

Removal of rubble
(overhead crane, etc.)

Installation of
a fuel handling facility

Removal of fuel

Completed

At Unit 1, removal of rubble from the center portion on the north side of the operating floor, at the upper part of the reactor building, was begun in January 2018.
Work to support the overhead crane and fuel handling machine on the south side of the operating floor was completed in November 2020.
Goiong forward, we plan to construct a large cover that emcompasses the entire building and remove rubble from under the cover.

Unit 2 Status

 
Survey of internal state
 

South side of reactor building
Construction of a fuel handling facility
(access gantry+front chamber)

Installation of
a fuel handling facility
 

Removal
of fuel
 


Completed
 

Unit 2

A fuel handling facility (access gantry+front chamber) is being constructed on the south side of the reactor building in preparation for removal of spent fuel from Unit 2.

Unit 3 Status

Survey of internal state
 

Removal of rubble
 

Installation of
a fuel handling facility

Removal
of fuel

Completed
 

Removal of all fuel from Unit 3 was completed in February 2021.

Unit 4 Status

Survey of internal state
 

Removal of rubble
 

Installation of
a fuel handling facility

Removal
of fuel

Completed
 

Unit 4

Removal of all fuel assemblies from Unit 4 was completed in December 2014.

The status of progress on the mid- to long-term roadmap (decommissioning and contaminated water measures team meetings/secretariat conferences) is updated in monthly progress reports and other materials.
See the “Spent fuel pool measures” materials here for details.

to TOP